skip to Main Content
La Luz Market To Install Wind Turbines At Granadilla Port, Tenerife

La Luz Market to install wind turbines at Granadilla port, Tenerife

La Luz Market To Install Wind Turbines At Granadilla Port, Tenerife

Tenerife, Canary Islands, Spain (PortSEurope) June 18, 2018 – Granadilla port will become a logistics area for wind turbines in the Canary Islands, under a contract where logistics operatorsPérez Torres Marítima and Pérez Torres Marítima SL (PTM) will install 29 wind mills of Enercon and 21 of Gamesa.

In this sense, the Port Authority of Tenerife positions the Port of Granadilla as the most important logistics area for wind turbines in the Canary Islands, following the administrative request for temporary authorization of 50,000 m² of land for the wind turbines processed.

The Port of Granadilla is committed to becoming a space in the renewable energy sector, as well as operations in the repair sector for offshore vessels, where large spaces for cargo and cargo are also required. unloading and handling large pieces.

La Luz Market, S.L. is an integrated logistic operator with a stevedoring license at the Port of La Luz and Las Palmas.

Pérez Torres Marítima is a logistics company with interested in shipping agents, stevedores, storage, freight agents, forwarding agents, combined and multimodal transport.

Source: Canary Ports

Copyright (C) PortSEurope. All Rights Reserved. 2018.

Back To Top